PROJECTS

AKSAR NAZAR HYDROELECTRIC POWER PLANT – HIZAN BITLIS / TURKEY

START/END DATE: 2013 – 2017

CLIENT: MINISTRY OF ENERGY, REPUBLIC OF TURKEY


KEY FACTS

  • HIZAN BITLIS / TURKEY
  • PLANT CAPACITY OF 30.24 MWe SUPPLIED BY 2x11.78 MWe & 1x6.68 MWe POWER GENERATION UNITS
  • 10,000 M3 OF CAST IN PLACE CONCRETE
  • 7,000 M LONG, 4.8 M DIA WATER TRANSMISSION TUNNEL TO FEED THE HORIZONTAL TURBINES POWERING THREE PHASE SYNCHRONIZED GENERATORS
  • EXPLOSIVE CHARGES, EXCAVATORS, AND PNEUMATIC HAMMERS USED TO EXCAVATE TUNNEL
Back