DOGUBEYAZIT COMPRESSOR STATION (CS-1) – DOGUBEYAZIT/TURKEY
START/END DATE: 1998 – 2003
CLIENT: BOTAS A.S.
KEY FACTS
- DOGUBEYAZIT/TURKEY
- CONSTRUCTION OF COMPRESSOR STATION WITH 1,270,000 M3 PER HOUR DESIGN FLOW
- 3 EA 10.3 Mw COMPRESSOR UNITS
- PIG STATION, GAS REDUCTION STATION, START GAS & FUEL GAS SKIDS, SEPARATORS, GAS COOLER
- WATER WELL & PUMP HOUSE, AUXILIARY BUILDING, SECURITY BUILDING 8 ROOM GUEST HOUSE, 8 OPERATOR APARTMENTS
- CC CAMERA SYSTEM, INSTRUMENT AIR SYSTEM, FIRE DETECTION AND SUPPRESSION SYSTEMS, PAVED ROADS, PARKING, FENCING, AREA LIGHTING
- PRE-ENGINEERED STRUCTURES
- STORM DRAINAGE AND SITE IMPROVEMENTS